Commercial and industrial only, no residential Dallas and Fort Worth 24/7 emergency dispatch 469-423-6724

Warehouse & Industrial Space

Warehouse and Industrial HVAC Service in Dallas

A hundred-thousand-square-foot warehouse does not condition like an office floor. Heat stacks up near the roof deck while the floor stays cold, dock doors open and close all shift long, and a piece of process equipment somewhere on the line can throw off more heat than the HVAC system was ever sized to offset. We service the high-bay units, dock area equipment, and rooftop systems that carry these buildings across Dallas and Fort Worth.

  • Same-day and next-day service calls
  • Chiller plants up to 500 tons
  • All major brands
High-bay unit heaters and destratification fans inside a Dallas warehouse ceiling

Common challenges

Large open volumes that heat and cool unevenly

Warm air stratifies near the ceiling in winter while workers at floor level stay cold, a pattern destratification fans and properly aimed unit heaters are built to correct.

Make-up air falling behind at loading docks

Dock doors cycling open through a shift pull conditioned or heated air out of the building faster than an undersized make-up air source can replace it.

High-bay unit heaters and rooftop equipment running near their limit

Facilities that expanded floor space without adding capacity often find existing units working harder every season just to hold the same setpoint.

Process heat competing with the comfort system

Ovens, compressors, and production equipment add heat loads the original HVAC design never accounted for, throwing off zones near the equipment even when the rest of the building reads normal.

Equipment we work on

  • High-bay gas-fired unit heaters
  • Destratification fans
  • Rooftop package units sized for open floor plans
  • Loading dock heating equipment
  • Overhead radiant tube heating

Why it matters

A warehouse that runs too cold at floor level slows down workers handling product by hand, and a facility that overheats near production equipment can affect materials as much as people. Downtime on a high-bay unit during a cold stretch is not a comfort inconvenience alone, it can stop a shift from meeting its pick or pack targets on schedule.

Common questions

Why does the floor stay cold even when the unit heaters are running?

Heat rises and pools near the roof deck in a large open space unless destratification fans are pushing it back down, which is a common gap in warehouses that were never fitted with them.

Can you size heating for a warehouse that added square footage after the original system was installed?

Yes, we run a load calculation on the current footprint and occupancy rather than assuming the existing equipment was ever sized for the expanded space.

Do dock doors really affect the rest of the building's temperature?

On a busy shift, repeated door cycling near the dock can pull enough air through the building to shift temperature well past the immediate dock area, especially without adequate make-up air.

Do you work on facilities with production equipment adding extra heat to the space?

Yes, we account for equipment heat loads separately from the building envelope when diagnosing why a zone near production runs hot.

Tell us about the building and the equipment involved, and we will get a technician scheduled.

Request commercial HVAC service

Prefer to talk it through? Call 469-423-6724.

Call 469-423-6724 Request service